Gas Passage under the pavement in Basil Street for Harrods

This project was for Harrods in Knightsbridge:
There is a passage that runs under the pavement for the perimeter of Harrods where services run for the operation of the store, over the years the structure that supports the pavement in Basil Street was found to have deteriorated and as a matter of on going maintenance the Harrods Engineers decided to rectify the situation.

Harrods structural engineers came up with a design solution, Restore London Ltd was employed as the main contractor and ROC Service Ltd was employed to carry out the works ROC Service Ltd surveyed the site, modelled the design from the Structural Engineers specification and sought approval.

During this time we removed the paving slabs and sent for storage, demolished the substrate to expose the damaged steelwork, removed and replaces the steelwork, installed the Rib deck, reinforcing bars, poured concrete and fully waterproofed the whole area ready for the toppings and reinstatement of the slabs.

CALL US TODAYNOW

Platform Canopy Repair

Manor Park Station
During the refurbishment of Manor Park Station, and the DDA Compliance, part of the canopy on platform 2/3 was demolished to allow for an elevator to be installed, our task was to design and manufacture a new capping to finish the end of the canopy, this was installed in 1 no. 12 hour possession shift.

CALL US TODAYNOW

Platform Canopy Repair

Seven Kings Station
During the refurbishment of Seven Kings Station, and the DDA Compliance, part of the canopy on platform 2/3 was demolished to allow for an elevator to be installed, our task was to manufacture and install 16 Tonnes of steel, this was successfully carried out in one 50 hour possession, we then supplied and installed the purlins, the Kingspan roofing and the dagger boards in four subsequent weekend possessions.

CALL US TODAYNOW

Interested in starting a project? Call us Today - 01708 478 552